Skip to content

Validate after update expectations

The tool launches a pipeline to know if the uprev can be made clean and, if not, checks if the expectations can be updated. But after that, it wasn't verified that this modification worked as expected. So, once the uprev is in the merge request, the tool triggers the pipeline on it to have this verification.

This merge request depends on !10 (merged), !12 (merged) and !14 (merged)

Edited by Sergi Blanch Torné

Merge request reports

Loading