Skip to content

Set a start/end timestamp into the results

Corentin Noël requested to merge tintou/deqp-runner:tintou/start-end into main

Allows to understand which job is running in parallel of which other jobs. The timestamp is relative to the start of the runner call.

Edited by Corentin Noël

Merge request reports

Loading